A number of McKinney's park pavilions will be re-roofed or receive roofing repairs in March. The pavilions will be closed for one day while the repairs are being made. The schedule below is subject to change due to weather or other factors.

The scope of work for all parks except Rowlett Creek Park is as follows:

  • Remove and dispose of existing metal roof system.
  • Prepare roof surface for new Duro-Last roofing system.
  • Install Duro-Last LokSeam metal roofing system.
  • Provide a paint and finish warranty.

The scope of work for Rowlett Creek Park is as follows:

  • Open Market item: Powerwash roof area
  • Open Market Items are not covered under the Duro-Last warranty.


Pavilion Roofing Schedule
DateParkAddress
March 6Falcon Creek Park pavilion301 Peregrine Dr.
March 7Serenity Park pavilion6701 Berkshire Rd.
March 8Katherine B. Winniford Park pavilion4900 Highlands Dr.
March 11-15Gabe Nesbitt Baseball Concession7001 W. Eldorado Pkwy.

Double Level Hip Shade 7001 W. Eldorado Pkwy.
March 18Horizon Park pavilion401 Flatrock Dr.
March 19Ledbetter Park Picnic Shelter312 Bluewood Dr.
March 20Rowlett Creek Park pavilion4200 Big Fork Tr.