Church Henry McKinney Project

Project Overview

The City of McKinney is preparing for infrastructure improvements including the following:

  • Street pavement reconstruction.
  • Underground water and wastewater, enclosed storm drainage system construction.
  •  ADA-accessible pedestrian walkways. 
  • Street lighting improvements at select locations. 
  • Necessary underground water and wastewater mains improvement or reconstruction.

Jump to Topic

Affected Areas

This project will affect 5 different areas:

  • Church Street | Davis Street to Standifer Street
  • Henry Street | McKinney Street to Kentucky Street
  • McKinney Street | Davis Street to Howell Street
  • Davis Street | Church Street to Kentucky Street
  • Wood Street |Louisiana Street to Henry Street
    • Including drainage improvements south of Henry Street to the existing storm drain crossing at Standifer Street

Top

Public Engagement Opportunities

Project information, exhibits, and a feedback form will be available on this page for review from Monday, Nov. 6  until Monday, Nov. 20. All feedback will be considered before finalizing the designs and construction plans. Construction is anticipated to begin in the fall of 2024 (subject to change).

For questions about this project, please email [email protected] or call 972-547-3493.