Will I have access to my driveway during construction?

Construction of the improvements will be phased to minimize impacts along the street as much as feasibly possible. The contractor will be required to provide local access to the street at all times during construction of the project. A suitable all-weather material will be provided in areas that street paving is removed and prior to construction of the new street pavement. There may be isolated occurrences where the contractor will need to restrict access to driveways while installing underground utilities or repaving driveways. These isolated occurrences will be coordinated with property owners during construction. Please be aware that on-street parking may not be permitted during construction to ensure that there is sufficient space for local traffic and emergency vehicles.

Show All Answers

1. When is construction expected to start and how long is construction expected to last?
2. Will I have access to my driveway during construction?
3. Why is sidewalk only being provided on one side of the street?
4. I have trees located in or near the street/public right-of-way. Will they be removed during construction?
5. Will street lighting be provided as part of this project?
6. Why are portions of Griffin Street less than 26-feet in width?
7. Will the street be concrete or asphalt?