Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Construction Meter Application

  1. TERMS OF USE:

    • The meter will have all fittings and equipment attached and unaltered and locked to a fire hydrant at all times.

    • Meter staff will read the meter the first week of each month; billing will follow accordingly.

    • Failure to comply will result in immediate forfeiture of the deposit and meter.

    • Damage to the meter and its components will be assessed at current replacement costs.

    • PLEASE TAKE NECESSARY PRECAUTIONS TO PROTECT, ESPECIALLY DURING EXTREME TEMPERATURES

    Schedule relocation or pickup of meter 

    • Pre-Paid Deposit: $2,500.00 (City of McKinney will call to collect)

  2. MONTHLY CHARGES
    FeesInside City LimitsOutside City Limits
    Base Fee$138.85$170.10
    Usage Fee$50.00$50.00
    Consumption per 1,000 gallons$5.45$6.70
  3. ONE TIME FEES
    One-time Charges (if applicable)Fee
    Initiation Fee$50.00
    Tampering Fee$100.00
    Damaged Collar Lock$50.00
    Removal for non-payment$50.00
    Relocation Fee$50.00
  4. Flagging tape is available in our office. If hydrant cannot be identified, a City of McKinney technician must be able to reach site contact before meter will be delivered.

  5. Terms of Use Acceptance*
  6. Leave This Blank:

  7. This field is not part of the form submission.